Smart home checklist before villa finishing
A practical pre-finishing checklist for Egyptian villas: wiring, switch boxes, network points, cameras, curtain motors, AC control, panels and handover planning.
Electrical and low-current checklist
- Neutral wire available at smart switch locations.
- Deep switch boxes for smart modules and future maintenance.
- Conduit to ceiling access points, cameras, intercoms and gate controls.
- Power points near curtain tracks, TV walls and network cabinets.
Room-by-room planning
Create scenes by how the family uses each room: Welcome, Evening, Guest, Movie, Sleep, Away and Vacation. This helps installers map switches, sensors, curtains and AC control to real daily routines.
Handover and training
Before handover, label devices clearly, document the network cabinet, test manual switches, train family members on wall scenes, and keep admin access safely with the owner.
Common questions
Do I need to choose all devices before finishing?
No, but you should reserve wiring, boxes, power points and network paths so future devices can be added cleanly.
Are smart switches useful if I already use an app?
Yes. Wall switches keep the home easy for parents, guests and staff, while the app is best for remote control and schedules.
What is the biggest mistake before finishing?
Leaving network, camera, curtain and panel locations until after paint and gypsum work, which makes installation messier and more expensive.